Skip to content
New: a sample workflow audit report
Scenox Studios

Coordinate unit turnover tasks and vendors

When a move-out is confirmed, the system creates the turnover checklist, books cleaners, painters and repair vendors in the right order, and keeps the move-in date in view. Delays are flagged to the manager early. For property teams juggling several turns at once.

Coordinate unit turnover tasks and vendors

6 steps

  1. 01

    Build the schedule

    Rules
  2. 02

    Read the move-out inspection

    Model
  3. 03

    Approve the scope

    Person
  4. 04

    Book the vendors

    Rules
  5. 05

    Track and nudge

    Rules
  6. 06

    Raise the delay flag

    Rules

At a glance

Trigger
A notice to vacate or a move-out date is recorded.
Typical inputs
  • Move-out and next move-in dates
  • Unit condition notes and inspection photos
  • Turnover checklist and standard task durations
  • Vendor availability and rate sheets
Systems it usually connects to
  • AppFolio
  • Yardi
  • Google Calendar
  • Slack
How the work splits

4 rules, 1 model, 1 person steps

How it runs, step by step

6 steps, each tagged by what does the work. Rules are fixed logic, a model reads or drafts, and a person decides.

  • Rules Fixed logic in code
  • Model AI reads or drafts, with a confidence score
  • Person A named person decides
  1. 1

    Build the schedule

    Rules

    A checklist is created from your standard turn, with tasks sequenced backward from the next move-in date.

  2. 2

    Read the move-out inspection

    Model

    A model reads inspection notes and photos and proposes extra tasks, such as carpet replacement or a wall repair.

  3. 3

    Approve the scope

    Person

    The property manager confirms the added scope and any cost above the turn budget.

  4. 4

    Book the vendors

    Rules

    Requests go to vendors in sequence, and confirmed times are written to the calendar and the work order.

  5. 5

    Track and nudge

    Rules

    Each task is monitored, vendors get reminders and a missed task re-sequences the rest of the plan.

  6. 6

    Raise the delay flag

    Rules

    If the plan can no longer meet the move-in date, the manager and the leasing agent are alerted with the options.

Where people approve

The decisions that stay with your team, whatever the confidence score says.

  • The manager approves scope additions and cost overruns.
  • A person inspects the unit before it is marked ready.
  • Security deposit deductions are decided by staff.

KPIs to track

What to measure, before and after. Targets come from your own baseline.

  1. 01Days vacant between tenants
  2. 02Share of turns finished by the planned ready date
  3. 03Turn cost against the unit budget
  4. 04Vendor no-shows per month

Questions about this workflow

Can it set deposit deductions?

It can list the items and attach photos, but the deduction itself is a decision for your team under your local rules and lease. We leave that as a Person step.

How does it choose a vendor?

By the rota and rules you provide: trade, area, price list and past reliability. It does not negotiate rates. A manager can pin a preferred vendor for any property.

Which steps use rules, a model and a person?

Rules: build the schedule; book the vendors; track and nudge; raise the delay flag. Model: read the move-out inspection. Person: approve the scope. Rules are fixed logic in code. A model reads or drafts and reports its confidence. A named person decides.

What do we need to start?

Typically: move-out and next move-in dates; unit condition notes and inspection photos; turnover checklist and standard task durations; vendor availability and rate sheets. You also need read access to AppFolio, Yardi, Google Calendar and Slack, or the equivalents you use. A workflow audit measures your volumes and past cases first, then gives a fixed price for the build, so you can decide with real numbers.

Where this fits at Scenox

More use cases like this one

All 60 use cases

Plan how to coordinate unit turnover tasks and vendors with an engineer.

A 30-minute call with an engineer. You will leave knowing what a system could do for that workflow and what it would take to build.

What happens next

  1. 1

    Strategy call

    We learn how the workflow runs today and what a good outcome would be.

  2. 2

    Workflow audit

    We map the process and measure where a system would save the most time.

  3. 3

    Proposal

    A written scope, timeline and fixed price for your first system. No obligation to build.